PRE-MOVE LABORATORY CHECKLIST
Purpose:
Ensure the laboratory is safe, organized, documented, and ready for relocation before the move begins.
MOVE PLANNING
☐ Confirm move date and timeline
☐ Identify move coordinator and responsible personnel
☐ Determine what will be moved, discarded, transferred, or replaced
☐ Confirm destination space is ready
☐ Establish communication plan and key contacts
☐ Confirm building access, loading dock, elevator, and delivery requirementsSAMPLES AND BIOLOGICAL MATERIALS
☐ Complete inventory of all samples and biological materials
☐ Identify materials requiring special handling or temperature control
☐ Determine what will be transferred, disposed of, or archived
☐ Confirm packaging and transportation requirements
☐ Arrange dry ice, liquid nitrogen, freezers, or other temperature-controlled transportation as needed
☐ Document chain of custody when requiredCHEMICALS AND HAZARDOUS MATERIALS
☐ Complete chemical inventory
☐ Identify hazardous, expired, or unwanted materials
☐ Dispose of materials that will not be moved
☐ Confirm transportation requirements for hazardous materials
☐ Ensure all containers are properly labeled and secured
☐ Coordinate hazardous-material pickup or relocation as neededEQUIPMENT
☐ Create equipment inventory
☐ Record equipment ID and serial numbers
☐ Identify equipment requiring shutdown, decontamination, disconnection, or specialized movers
☐ Back up critical equipment data and settings
☐ Coordinate vendor or service support when necessary
☐ Determine whether equipment requires calibration after relocationDECONTAMINATION AND SAFETY
☐ Determine decontamination requirements for equipment and work areas
☐ Complete required equipment and area decontamination
☐ Obtain required decontamination documentation or certification
☐ Disconnect utilities safely
☐ Review applicable biosafety, chemical safety, radiation safety, and other requirements
☐ Remove or secure hazardous materials before movers arriveDOCUMENTATION AND RECORDS
☐ Photograph equipment and laboratory areas before the move
☐ Update equipment and material inventories
☐ Record equipment condition
☐ Preserve maintenance and calibration records
☐ Identify documents or records that must remain with specific equipment
☐ Update equipment locations in inventory or asset-management systemsDESTINATION READINESS
☐ Verify required utilities are available
☐ Confirm electrical requirements
☐ Confirm gas, vacuum, water, ventilation, and other connections
☐ Confirm benches, cabinets, storage, and specialty spaces are ready
☐ Verify freezer and refrigerator capacity
☐ Confirm required safety equipment is installed and accessible
☐ Confirm equipment will fit and can be safely installedFINAL PRE-MOVE SIGN-OFF
☐ Samples accounted for
☐ Chemicals accounted for
☐ Hazardous materials addressed
☐ Equipment inventory complete
☐ Required decontamination complete
☐ Equipment shutdown and disconnection coordinated
☐ Destination space ready
☐ Utilities confirmed
☐ Movers and vendors scheduled
☐ Required documentation complete
☐ Final walkthrough completed
☐ Responsible personnel have signed off
FINAL STATUS:
☐ READY TO MOVE
☐ NOT READY — CORRECTIVE ACTIONS REQUIRED
Notes:
Responsible Person: __________________________
Date: __________________________
Final Approval: __________________________